News
3 new cogeneration units installed in Wallonia
20 January 2022
Pontpierre, France, January 20th, 2022 – La Française de l’Énergie (Euronext: LFDE – ISIN: FR0013030152), a carbon negative energy producer, announces the commissioning of 3 additional cogeneration units at its Anderlues site, in Wallonia, which installed capacity increases from 3.0 to 7.5 MW, a per its planned field development.
This very significant increase in production capacity in Belgium occurs in a particularly favorable electricity price environment with average sales prices expected at more than € 200 per MWh in the first quarter.
A major contribution to the reduction of greenhouse gas emissions
Thanks to the 5 cogeneration units now installed, the capture of coal mine gas on the Anderlues site will allow the group to avoid an annual emission of over 500 000 tonnes of CO2eq and will foster the positioning of La Française de l’Energie as one of the main players in the energy transition of the Walloon region.
La Française de l’Energie confirms its objective of achieving annualized revenue of € 35 million and an EBITDA margin of over 45% by the end of 2022.
Next announcement :
S1 2021-2022 Sales – January 25th 2022